top of page

Construction

Construction

The attachment will be made from C channel steel and square steel tubing. The base of the attachment will be made from the C channel to bolt to the cart, this base will have 4 holes drilled, 2 on each side for mounting to the cart with grade 8 bolts. In the center of the channel the square steel tubing to mount the second part into. There is a piece of square tubing with a plate attached to the top, this will hold the bearing. The square tube will be welded to the top and bottom plates for rigidity.

The first part of the attachments assembly will be the base, the base is a 23in long piece of C channel steel that will be bolted to the frame of the dyno cart. Attached to the base by welding is the 3 inch piece of square steel tubing, this will house the pillow block bearing mount and the sliding piece of smaller square steel tube. 

 

bottom of page